We’re proud to mark the completion of the final GRC installation above the iconic blue frieze at Angel Square – a major milestone in this standout project.

This achievement reflects the dedication, precision, and craftsmanship of everyone involved, and we’re especially pleased to have delivered this phase in partnership with @FKN UK Ltd.

Leak investigation and remedial works have been successfully carried out and completed at 610 Centennial Avenue!

Our team worked diligently to identify the source of the issue and provide a lasting solution — ensuring peace of mind and long-term protection for the property.

1 Paddington Square

A total of 40 glass units have been successfully installed on Level 17 terrace at 1 Paddington Square.

Access Method: Glass distribution and installation were carried out via BMU (Building Maintenance Unit).

Fixing System: Units installed using the GML800 system.

Well done to our operatives & all parties involved.

Façade Inspection at 1 Lakeside Drive

Our team carried out a detailed façade inspection to verify the presence and proper installation of cavity barriers. These fire safety components are critical in slowing the spread of fire and smoke between compartments in a building. Ensuring they are correctly installed is a vital part of maintaining compliance and protecting lives.

Kia - Oval Stadium

Reinstallation and setting out of existing capping on the viewing terrace at The Kia Oval Stadium following completion of waterproofing works carried by our client.

40 Leadenhall

IMultiple glass units replacements carried out in partnership with our client FOCCHI Ltd on the Ground Floor of their recently completed project 40 Leadenhall St.

Client
FOCCHI Ltd

Year
June 2025

HMRC Westfield Ave

*

HMRC Westfield Ave *

Client
FOCCHI Ltd

Year
April 2025

GF glass replacement carried out by our skilled operatives at HMRC Westfield Ave during night shift in partnership with FOCCHI.

81 Newgate St.

*

81 Newgate St. *

Client
FOCCHI Ltd

Year
April 2025

Glass replacement carried out with the help of the OSCAR 1000 hydraulica assisted by abseilers externally. The equipment used to de-glaze & glaze this 2 units made it much easier and faster for our operatives.

1-5 Bank Street

Glass replacement carried out with the help of the OSCAR 1000 hydraulica assisted by abseilers externally. The equipment used to de-glaze & glaze this 2 units made it much easier and faster for our operatives. Following this methodology there was no need to use the BMU.

Client
Lindner Prater

Year
November 2024

The Corniche x Vauxhall

Glass replacements carried out by our skilled operatives at The Corniche in partnership with Lindner Prater.This procedure was carried out via Smart Lift glass manipulator from inside the occupied flat to transfer the glass to the BMU GRU to be brought down safely. The clearance that they had to remove and install the glass safely was around 20mm. Well done to our operatives for completing this job safely. Keep up the good work!!

Client
Lindner Prater

Year
August 2024

Battersea Power Station Farraday House

Complex glass replacement carried out by ISL Operatives in a residential plot. Works involved the removal of the damaged glass pane and installation of the new glass.

Client
Lindner Prater

Year
2023

One Churchill Place

Replacement of damaged unit carried out by ISL Operatives via internal BMU.

Client
LDD

Year
2023

Blossom Street S1

Replacement of broken glass unit carried out at S1 Blossom Street by ISL Operatives.

Client
Lindner Prater

Year
2023

Heathside & Lethbridge

Removal of existing canopy glass followed by structural beams installation.

Client
Ardmore

Year
2023

SOHO PLACE

Replacement of all Ground Floor Curtain Wall glass with e-clarity special coated glass.

Client
Lindner Prater

Year
2023

1 Principal Tower

Over the course of the past 3 years ISL has been carrying out several glass replacements in Principal Towers.

Client
Lindner Prater

Year
2021 -2023

62 Buckingam’s Gate

Replacement of damaged Glass Canopy Glass

Client
Lindner Prater

Year
2020 - 2023

Chertsey Samsung HQ

Replacement of damaged units via compact mini crane & OSCAR glass manipulator

Client
Lindner Prater

Year
2021

Nine Elms, Embassy Garden

Replacement of damaged sliding door glass via mobile tower crane.

Client
Lindner Prater

Year
2020

10 Lewis Cubit Square - Facebook Meta

Client
Lindner Prater

Year
2022 - 2023

R7 King’s Cross - Facebook HQ

Replacement of damaged glass units via GLASSBOY 500 & OSCAR 1400 Long Reach

Client
Lindner Prater

Year
2022

88 Wood Lane - Imperial West

Replacement of damaged glass units via BMU & Abseilers

Client
Lindner Prater

Year
2022 - 2023

Next
Next

1 Finsbury Avenue